US Building Permits
Last updated November 26, 2026
Building permits issued in New York, Los Angeles, Chicago, San Francisco, Austin, and Seattle, from each city's open data portal. Filter by issue date, job value, and keywords. One row per permit with type, description, status, dates, value, address, and contractor where published.
Install
npx @mambalabsdev/mcp-us-building-permitsEvery tool here also runs hosted, with no install at all, through Apify's MCP endpoint.
Features
- One row per permit: number, type, description, status, dates, job value, address, and coordinates.
- Contractor business, contact, phone, or license where the city publishes them.
- Filter by issue date, minimum job value, keywords, and contractor named.
- Repeats and city summaries are free.
- Pay per event: Permit row at $0.0045.
Input
citiesarrayoptionalCities to read: new-york, los-angeles, chicago, san-francisco, austin, seattle. Short names such as nyc, la, and sf also work. From Clay, put the column inside a one item list.
issued_afterstringoptionalEarliest issue date, as YYYY-MM-DD. Default: 30 days before the run.
issued_beforestringoptionalLatest issue date, as YYYY-MM-DD. Default: no end date.
min_value_usdstringoptionalOnly permits whose declared job value is at least this many US dollars, for example 50000. Permits with no declared value are left out when this is set.
keywordsarrayoptionalOnly permits whose description or type contains any of these words, for example roof, solar, new construction, pool. Case does not matter.
with_contractor_onlystringoptionalyes: only permits that list a contractor business. New York, Chicago, Austin, and Seattle publish contractors; Los Angeles and San Francisco do not, so they return a free note. Default no.
max_permits_per_citystringoptionalMost permit rows per city, newest first. Default 100, up to 10000.
max_charge_usdstringoptionalOptional. The run stops before a charge that would pass this amount. Summary rows are always returned.
Output schema
{
"row_type": "string",
"city": "string",
"city_key": "string",
"permit_number": "string",
"permit_type": "string",
"work_type": "string",
"description": "string",
"status": "string",
"filed_date": "string",
"issued_date": "string",
"expires_date": "string",
"value_usd": "number",
"housing_units": "number",
"address": "string",
"zip_code": "string",
"latitude": "number",
"longitude": "number",
"contractor_name": "string",
"contractor_contact_name": "string",
"contractor_phone": "string",
"contractor_license": "string",
"contractor_trade": "string",
"applicant_business_name": "string",
"owner_business_name": "string",
"record_url": "string",
"dataset_url": "string",
"permits_charged": "integer",
"permits_read": "integer",
"issued_after": "string",
"issued_before": "string",
"row_status": "string",
"error_reason": "string",
"billable_events_json": "string",
"scraped_at": "string"
}Pricing
| Event | Free plan price |
|---|---|
| Permit row | $0.0045 |
| Actor Start | $0.007 |
Pay per event on the Apify platform. Paid Apify plans pay less per event. No subscription, no seat license.
On the Apify free plan the actor stops at $1.50 of charges a month, about 333 permits. Any paid Apify plan removes the cap.
Limits
- Six cities only. Each city publishes different columns, so a field a city does not publish is empty for that city.
- Fill rates differ by city. In test runs on 2026-11-17: Austin listed a contractor on 93 of 100 permits but a job value on 19 of 100; Seattle listed a contractor on 3 of 100. New York, Chicago, Los Angeles, and San Francisco listed a value on 100 of 100.
- Job values are what the applicant declared to the city. Los Angeles, San Francisco, and Seattle list estimates; some permits carry no value and are left out when min_value_usd is set.
- Owner names of people are never returned, and no owner address is returned. New York lists an owner business name where one is filed; that is the only owner field.
- Contractor phones and names are returned only as the city publishes them. The actor does not look up or guess any contact detail.
- A city portal updates on its own schedule, usually daily, so the newest permits may lag the city's own system by a day or more.
- Chicago data terms ask applications that use modified city data to show this notice: "This site provides applications using data that has been modified for use from its original source, www.cityofchicago.org, the official website of the City of Chicago. The City of Chicago makes no claims as to the content, accuracy, timeliness, or completeness of any of the data provided at this site. The data provided at this site is subject to change at any time. It is understood that the data provided at this site is being used at one's own risk."